Australian National University
1,000m2
Managing Contractor
AMA Projects were engaged to manage the delivery of the new Bioinformatic and Ecogenomic laboratories at the Australian National University.
Works included:
As the building remained occupied by staff during the construction period, careful attention was paid to safety, with noisy works and power shutdowns performed after hours to minimse impact on tenant operations. The original structural design required the existing roof to be removed for the slab installation. AMA Projects proposed an alternative method to avoid removing the roof and in doing so, saved substantial costs.