Transport for NSW
320m2
Lump Sum
AMA Projects were engaged by Transport for NSW to convert the dilapidated existing building at the Bowenfels depot in Lithgow into a new soil laboratory.
The works involved:
Previously unidentified asbestos was encountered on site during the construction process. Due to existing good working relationships with subcontractors and the client, AMA Projects were able to get the asbestos contractor on site at short notice which prevented long delays to the programme.
The works were originally scheduled to be completed in two stages which was a challenge due to the tight timeframes. AMA Projects were able to successfully manage occupancy requirements to allow the work to be delivered in one stage allowing for completion before the key dates.