CSIRO
4,000m2
Construction Manager
AMA Projects were engaged as managing contractor to perform the remediation to the damaged glasshouses on the CSIRO Black Mountain Campus.
The works involved:
The re-cladding of existing structures with the dual-skin horticultural film had not been done before. AMA Projects worked closely with the supply chain to ensure the solution met CSIRO’s stringent requirements and the involvement and design management mean that the end product was able to be integrated into the existing structure.