Knight Frank / ISPT
50m2
Lump Sum
AMA Projects were engaged to perform a lift and lobby upgrade at 6 National Circuit, Barton ACT.
The works included:
The works were conducted in an occupied building with an operational lift lobby, requiring certain works to be scheduled after-hours so there were no disruptions to the tenants.